A 30×50 ft site is 1,500 sq.ft. At roughly 1,250 sq.ft built-up per floor, turnkey construction runs from about ₹20.2 lakh for a ground-floor house to ₹1.39 crore for a G+3 building, depending on floors, package and finishes.
Share your plot dimensions and floors — we'll send a configuration-wise estimate.
No spam. Our team will contact you only for your house construction requirement.
A 30×50 ft plot is 1,500 sq.ft. Turnkey construction cost ranges from about ₹20.2 lakh for a ground-floor house to ₹1.39 crore for a G+3 building, driven mainly by the number of floors and the package (₹1,799–₹2,529/sq.ft, GST included). Configuration-wise costs, planning notes, rental options, timeline and FAQs are below. For the city-wide picture see construction cost in Bangalore or use the construction cost calculator.
A 30×50 ft plot measures 1,500 sq.ft. After the front, rear and side setbacks in your sanctioned plan, we use about 1,250 sq.ft of built-up area per floor as a planning figure (a range of 1,125–1,375 sq.ft). The approved drawing gives the exact number.
Construction is costed on built-up area × package rate, so the two levers that move a 30×50 budget most are the number of floors and the package (₹1,799–₹2,529/sq.ft, GST included).
A 30×50 gives about 25% more area than a 30×40 on the same 30 ft frontage. That extra depth usually goes into a larger living-dining space, an additional bedroom or a rear sit-out, without changing the frontage-driven layout.
| Configuration | Approx. Built-up Area | Estimated Cost Range (incl. GST) | Typical Use |
|---|---|---|---|
| Ground floor only | 1,125–1,375 sq.ft | ₹20.2 lakh – ₹34.8 lakh | Single-floor family home |
| G+1 house / duplex | 2,250–2,750 sq.ft | ₹40.5 lakh – ₹69.5 lakh | 3 BHK family home or duplex |
| G+2 (owner + rental) | 3,375–4,125 sq.ft | ₹60.7 lakh – ₹1.04 crore | Owner floor + rental units |
| G+3 rental building | 4,500–5,500 sq.ft | ₹81.0 lakh – ₹1.39 crore | Rental income focus (check FAR/approval) |
Ranges apply the Dream Value (₹1,799) to Signature Home (₹2,529) rates. Civil construction only — approvals, compound wall, borewell and external works are separate. Whether a G+2 or G+3 is permitted on your plot depends on road width, FAR/FSI and parking norms. Check your own numbers with the construction cost calculator.
Bar length scaled to the upper figure of each range. Civil construction only, before approvals and external works.
Using ~2,500 sq.ft built-up for a 30×50 G+1:
| Package | Rate / Sq Ft | Approx. Cost (2,500 sq.ft) |
|---|---|---|
| Dream Value | ₹1,799 | ₹45.0 lakh |
| Dream Home | ₹1,919 | ₹48.0 lakh |
| Luxury Home | ₹2,129 | ₹53.2 lakh |
| Premium Home | ₹2,329 | ₹58.2 lakh |
| Signature Home | ₹2,529 | ₹63.2 lakh |
Adjust for your actual built-up area. Full specification comparison: house construction packages in Bangalore.
Floor plans are prepared for your specific plot, orientation and family requirement. These are common patterns, not a fixed design. See architectural design.
On a 30×50, a G+2 or G+3 with one or two units per floor is common, often a 2BHK per floor or two 1BHKs. Plan a single well-placed staircase, parking sized to the unit count, separate meters and adequate water storage, and confirm FAR/FSI and parking norms for your plot before finalising drawings.
See also: rental building construction in Bangalore.
| Stage | Indicative Duration |
|---|---|
| Design, drawings & approval | 4–10 weeks (approval varies by authority) |
| Foundation & plinth | 3–5 weeks |
| Superstructure (per floor) | 5–7 weeks per floor |
| Masonry, plastering, waterproofing | 4–6 weeks |
| Flooring, doors, windows, painting, finishing | 8–12 weeks |
Total time depends mostly on the number of floors: each additional floor adds about 5–7 weeks of structure plus its share of finishing. Approvals, design finalisation, weather and material selection also affect the schedule.
See the full breakdown on construction cost in Bangalore, or compare with the 30×40 house construction cost. To build with us, see house construction in Bangalore.
Get a configuration-wise estimate for your 30×50 plot.
Get 30×50 Cost Estimate