Turnkey G+2 and G+3 rental buildings for owners who want rental income from their plot — planned for efficient units, parking and separate meters, on per sq.ft packages from ₹1,799–₹2,529/sq.ft (GST included).
Share your plot size and number of floors — we'll send a floor-wise estimate.
No spam. Our team will contact you only for your house construction requirement.
A G+2 or G+3 rental building lets you live on one floor and rent the rest. In Bangalore the cost is driven by total built-up area across all floors and the package (₹1,799–₹2,529/sq.ft, GST included); a 30×40 G+2 costs about ₹48.6 lakh – ₹83.5 lakh for civil construction. Costs by plot size, planning points and FAQs are below. For the city-wide picture see construction cost in Bangalore or use the construction cost calculator.
| Plot Size | G+2 (3 floors) | G+3 (4 floors) |
|---|---|---|
| 20 × 30 ft | 1,500–1,800 sq.ft ₹27.0 lakh – ₹45.5 lakh | 2,000–2,400 sq.ft ₹36.0 lakh – ₹60.7 lakh |
| 30 × 40 ft | 2,700–3,300 sq.ft ₹48.6 lakh – ₹83.5 lakh | 3,600–4,400 sq.ft ₹64.8 lakh – ₹1.11 crore |
| 30 × 50 ft | 3,375–4,125 sq.ft ₹60.7 lakh – ₹1.04 crore | 4,500–5,500 sq.ft ₹81.0 lakh – ₹1.39 crore |
| 40 × 60 ft | 5,400–6,600 sq.ft ₹97.1 lakh – ₹1.67 crore | 7,200–8,800 sq.ft ₹1.30 crore – ₹2.23 crore |
Ranges apply the Dream Value (₹1,799) to Signature Home (₹2,529) rates to the approximate built-up area. Civil construction only. Whether G+2 or G+3 is permitted depends on road width, FAR/FSI and parking norms for your plot.
Most rental buildings are built on the Dream Value (₹1,799/sq.ft) or Dream Home (₹1,919/sq.ft) package, which control specifications and keep the cost per unit low. Owners often upgrade only their own floor's finishes. Compare specifications on the house construction packages page.
Plan approval for multi-floor buildings gets closer scrutiny. See our BBMP/BDA plan approval service and structural design.
| Stage | Indicative Duration |
|---|---|
| Design, drawings & approval | 4–10 weeks (approval varies by authority) |
| Foundation & plinth | 3–5 weeks |
| Superstructure (per floor) | 5–7 weeks per floor |
| Masonry, plastering, waterproofing | 4–6 weeks |
| Flooring, doors, windows, painting, finishing | 8–12 weeks |
A G+2 or G+3 takes longer than a family home mainly because of the extra floors: each floor adds about 5–7 weeks of structure plus finishing.